Daikin BRP072C42 Wireless LAN Adapter

SKU: BRP072C42

$80.90

Daikin BRP072C42 Wireless LAN Adapter

Overview
The BRP072C42 is a dedicated Wireless LAN adapter for selected Daikin wall-mounted and multi indoor units. Once installed, it allows users to remotely control their air conditioning system via smartphones or tablets, enabling ON/OFF, temperature adjustment, mode selection, and scheduling for improved comfort and energy efficiency.

Key Features

  • Wi-Fi enabled for easy connection to home or office networks

  • Remote operation via the Daikin Mobile Controller app

  • Supports scheduling and energy monitoring for optimized usage

  • Simple plug-in installation to the indoor unit WLAN port

  • Enhances system intelligence and user convenience

Compatible Series (New Zealand)

  • FTXZ-N

  • FTXM-U(PA)

  • FTXV-U(L)

  • FTKM-Q(PA)

  • FTX(K)F-T

  • FTXF-Q

  • DTXF-T

  • CTX(K)M-R

  • CTXF-T

Installation Requirements

  • FTXZ-N series: BRP072C42 can be installed directly, no additional accessory required.

  • Other series (FTXM-U(PA), FTXV-U(L), FTKM-Q(PA), FTX(K)F-T, FTXF-Q, DTXF-T, CTX(K)M-R, CTXF-T): BRP072C42 must be installed together with BRP067A42 or BRP980B42 .

Specifications

  • Model: BRP072C42

  • Type: Wireless LAN Adapter

  • Functions: Remote control, scheduling, energy management

  • Installation: Plug-in to indoor unit WLAN port

  • Application: Works with the Daikin Mobile Controller App

Usage Scenarios

  • Residential: Remote operation to pre-cool or pre-heat your home

  • Office: Centralized management of multiple units to save energy

  • Commercial: Smarter control and optimized comfort management

Additional information

Weight 0.0000 kg

Or something else?

Help & Support

Need help with a product? Unsure of anything or just having issues? Jump to our Help & Support Page!

Contact our branches

Skip the hassle & contact our stores directly? For any specific queries, jump to our Contacts Page!

Christmas Holidays

Thanks eveyone for your patience. All online orders will be processed after our team returns after 5th January 2026!